Projects

This section provides the latest news updates on a variety of world-wide tenders, projects, expansions contracts and acquisitions for stainless steel and related products.

Canada Nickel Company’s NetZero Metals Intends to Develop Downstream Nickel & Stainless-Steel Processing Facilities

These processing facilities are expected to be the largest nickel processing facility in North America and the largest stainless steel and alloy production facility in Canada.

Vestas Introduces Low-Emission Steel Offering for Wind Turbines

The low-emission steel is produced using 100% steel scrab which is melted in an electric arc furnace powered by 100% wind energy at the ArcelorMittal steel mill, Industeel Charleroi, in Belgium.

Heat Exchanger World Americas Returns – Submit Your Abstract Today!

Experts are invited to submit an abstract for a detailed PowerPoint presentation that they would like to present during the conference. Speakers are allocated approximately 20 minutes for their presentations.

Alleima Unveils New Alloy Designed Specifically For Subsea Umbilicals

The new tube product represents the next generation of super-duplex seamless tubing developed specifically for the offshore oil and gas industry.

Tenaris To Supply Coating Services for Mero 4 Project In The Brazilian Pre-Salt

The project will feature 15 wells connected to the Alexandre de Gusmão FPSO, which has a processing capacity of 180,000 barrels per day.

Express Program For Heat Exchanger Tubes

As the result of a new heat exchanger express hollows program, Alleima’s customers in Europe, Middle East, and Africa (EMEA) can now rest assured. It means EMEA customers who urgently need to replace heat exchanger tubes can get them in just eight weeks from order placement.

Salzgitter Orders One of Europe’s Largest Green Hydrogen Plants From ANDRITZ

ANDRITZ will build a 100 MW electrolysis plant at the Salzgitter Flachstahl GmbH site on an EPC basis, incorporating pressurized alkaline electrolyzer technology from HydrogenPro.

Tenaris Increases Capacity, Streamlines Supply Chain with New Service Center

The new Soyo service center spans 16,000 square meters, has a storage capacity of 5,000 tons of tubulars and a warehouse for the indoor storage of pipe accessories. 

Alleima Invests in New Facility

The greenfield facility will have more than 10,000 square meters floor space and will be built on the existing Alleima site in Zhenjiang in China.

ANDRITZ To Supply New 6-High Cold Rolling Mill to ArcelorMittal

The rolling mill will be capable of rolling up to 1,450 mm wide strip to a minimum finished material gauge of 0.2 mm.