Hyundai Steel Orders Heavy Plate Mill Equipment From Primetals Technologies To Increase Productivity

Recently, Primetals Technologies received an order from Hyundai Steel for the installation of a new intermediate cooling (IC) technology at its heavy plate mill line located in Dangjin, South Korea. The cooling unit will be installed between the roughing mill stand and the finishing mill stand. This enhancement will substantially increase the mill’s productivity, enabling the production of high-quality steel plates tailored to the most demanding markets, including the shipbuilding and oil and gas industries.

Primetals Technologies will be responsible for the design, engineering, equipment supply, installation, training, and commissioning of the IC unit, including electrical, automation, and related fluids equipment.

Courtesy of Primetal Technologies.

Previous articleDigital Application Simplifies Weld Traceability
Next articleThe Adoption Of “Nscarbolex Neutral” For Nittetsu Bolten’s Ultra-High-Strength Bolts.
Shopia Ketheeswararajah
Shopia Ketheeswararajah is a feature editor contributing to Pump Engineer, Stainless steel World Americas, Hose and Coupling World, and other related print & online media.